Gear inspection is 30 times faster with form measurement

Meltham Mills Engineering (MME) now takes only eight minutes to inspect every critical feature on a typical gear component, compared to four hours previously – 30 times faster. Simultaneously, data is gathered on the form of features, the first time MME has had this automated capability. This has been made possible using Renishaw’s SP25 scanning probe fitted to a new Mitutoyo Crysta co-ordinate measuring machine (CMM)

projít na článek

Five-axis CMM inspection lets "good times roll"

Scanning probes speed form-data collection and feedback to machining cells, reduce CMM fixturing and cut probe calibration time from hours to minutes at Kawasaki's Maryville, MO plant. Increased measurement throughput and flexibility allow faster feedba

projít na článek

TURBOCAM "high fives" revolutionary five-axis CMM measurement technology

Leader in five-axis turbomachinery production quickly adopts new five-axis Renishaw inspection system, gains faster throughput, greater CMM utilization, and easier programming

projít na článek

New 5-axis head for touch-trigger inspection on CMMs gives up to three-fold increase in throughput

Renishaw is introducing another innovative measurement product that is expected to transform inspection performance on a wide range of co-ordinate measuring machines (CMMs).

projít na článek

New ultra-compact inspection touch probes for lathes and turning centres

Renishaw's new RLP40 and OLP40 lathe inspection probes offer a choice of signal transmission technologies, radio or optical, to make part set-up and inspection on turning centres accurate, simple and reliable. Measuring just 40 mm in diameter and 58.3 mm

projít na článek

Whitepaper examines the hidden potential of co-ordinate measuring machines

Measurement is vital to any manufacturing business, providing essential information to control processes and verify products. But older co-ordinate measuring machines (CMMs) can become bottlenecks if they fail to keep pace with changing measurement needs

projít na článek